Saturday, August 16, 2008

Back to the Grind

August 4 ~ Finally the tree stumps were ground up. This took about six hours. Those filberts had very wide bases (of multiple shoots). Dust was EVERYWHERE! I had to hose off my brand new painted house -- but it cleaned off easily.



August 13 ~ I didn't get a picture, but we discovered standing water in one of the stump holes. So I had a "french drain" put in. This is basically a trench filled with sand and a large pipe to provide a conduit to move the water away from the house.

No comments: